What is the typical lead time for a PEB warehouse?
For a standard 2,000–5,000 sqm warehouse: 4–6 weeks engineering, 6–10 weeks fabrication, and 4–8 weeks erection depending on site readiness.
Do you handle design or only fabrication?
Both. We provide in-house structural design and Tekla detailing, or fabricate from your consultant's approved drawings.
Which codes do you design to?
BNBC 2020 as the governing code, with AISC/AWS/MBMA references as required by the project specification.
What is your factory capacity?
[PLACEHOLDER — e.g. 45,000 tonnes/year across CNC cutting, H-beam welding, and assembly lines.]
Can you work at our site outside Dhaka?
Yes. Our erection crews work nationwide, including coastal and remote sites, with full site safety management.
Do you provide erection only, without fabrication?
Generally no — we erect what we fabricate to keep single-point quality accountability. Exceptions are evaluated case by case.
How do you ensure weld quality?
WPS-qualified welders, stage inspection at every hold point, and NDT (UT/PT) per the project ITP, all documented in the handover dossier.
What surface treatments do you offer?
Shot blasting to SA 2.5 followed by epoxy/PU paint systems, or hot-dip galvanizing for aggressive environments.
What payment terms do you work with?
[PLACEHOLDER — typical terms: advance with order, milestone payments against fabrication and erection progress.]
Do you offer warranties?
[PLACEHOLDER — e.g. 12-month structural warranty from handover; coating warranties per paint system datasheet.]
Can you match a competitor's quoted steel weight?
We will review any design honestly. If weight can be saved safely, we will show the calculation; if a low weight is unsafe, we will show that too.
Do you supply cladding and accessories?
Yes — roof/wall sheeting, insulation, skylights, ventilators, gutters, and flashings as a complete envelope package.
How are your prices affected by steel market changes?
Quotations carry a validity period. Within it, prices are firm; beyond it, we re-confirm plate/section prices before contract.
Can you build over or beside an operating factory?
Yes. We plan lifts, sequence work, and coordinate with production schedules — several case studies cover live-facility projects.
Do you take small fabrication jobs?
[PLACEHOLDER — define minimum order policy.]
What information do you need for a quotation?
Location, building dimensions (length, width, eave height), crane requirements if any, and any consultant drawings or soil data you have.
Are your materials tested?
Every heat of steel comes with a mill test certificate, verified on receipt; we can arrange third-party lab testing on request.
Do you do turnkey civil + steel packages?
[PLACEHOLDER — clarify whether civil works are offered via partners.]
How do I track my project's progress?
A dedicated project engineer shares a weekly progress report with photos, fabrication percentages, and upcoming milestones.
Which areas of Bangladesh do you serve?
All divisions. Factory location: [PLACEHOLDER]. Erection crews mobilize nationwide.