Task Steel Corporation delivered the complete steel package for this Garment Factory Complex in Gazipur — from connection design and shop detailing through fabrication, surface treatment, and site erection.
Scope of Work
- Structural design review and Tekla detailing
- Fabrication of 910 tonnes of structural steel
- Shot blasting and industrial coating
- Site erection with certified crews
[PLACEHOLDER — replace with real project data in Phase 5]